Skip to content
◈SPORTWAVEICE RINK SOLUTIONS
Request a Quote

Resources

Practical ice rink planning guides, AST technical documentation and decision tools covering seasonal projects, rental vs purchase, ice technology, refrigeration sizing, energy efficiency and maintenance.

SPORTWAVE Resources

Practical ice-rink knowledge for better project decisions

This resource centre is built for clients, municipalities, architects, operators and project teams who need to make informed decisions about seasonal and permanent ice facilities.

The purpose is not to repeat product brochures. Each guide explains what to compare, which technical inputs matter, where common mistakes occur and what information is needed before a reliable solution can be selected.

Start with the decision you need to make

If you need to decide… Start here
How to plan a seasonal rink Seasonal Ice Rink Planning Guide
Whether to rent or buy Ice Rink Rental vs Purchase
Which ice-floor technology to use EPDM vs Concrete vs QuartzPhalt® / IcePhalt® vs SkateWay®
How much refrigeration is required Ice Rink Refrigeration Sizing Guide
How to reduce energy consumption Ice Rink Energy-Efficiency Guide
How to maintain the rink correctly Ice Rink Maintenance Checklist

Planning & Projects

Use these guides before equipment is fixed. They help define the operating model, site constraints, ownership strategy and information required for a realistic proposal.

Related: Ice Rink Rental, Mobile Ice Rinks, Design & Engineering and Projects.

Ice Rink Technology

The floor technology should follow the operating model. Seasonal removal, permanent construction, off-season use and custom geometry lead to different solutions.

Related: Mobile Ice Rinks, Permanent Ice Rinks, Multifunctional Ice Rinks and Ice Worlds & SkateWays.

Refrigeration & Energy

Related: Refrigeration Systems and EasyCHILL.

Operation & Maintenance

Ice Rink Maintenance Checklist

A working checklist for ice condition, thickness, refrigeration, hydraulics, resurfacing, boards, skates, humidity, energy trends, seasonal start-up and shutdown.

Related: Service & Maintenance, Operator Training and Resurfacing Equipment.

A practical reading path for a new project

  1. Define the operating model — permanent, seasonal, rental, event or multifunctional.
  2. Check site constraints — area, base, electrical power, water, drainage, plant location and access.
  3. Select the ice technology — EPDM, IceBox, permanent slab, QuartzPhalt® / IcePhalt® or SkateWay®.
  4. Calculate refrigeration and hydraulics — do not select cooling capacity from square metres alone.
  5. Plan operation — boards, resurfacing, skates, visitor flow, controls and staffing.
  6. Evaluate lifecycle energy and service — setpoints, heat recovery, monitoring, maintenance and spares.

AST technical documentation

For manufacturer drawings, brochures and technical product documentation, use AST’s official download library. SPORTWAVE uses these documents together with project-specific engineering rather than treating brochure data as a final design.

Relevant documents are linked from individual SPORTWAVE solution and equipment pages where they support a specific technical decision.

Technical updates that affect project decisions

New products and project references are added to SPORTWAVE only when they materially change selection, engineering or operation. Current examples include AST developments in custom ice geometry, professional board systems, energy management, reusable ice graphics and mobile-rink handling equipment.

For current manufacturer developments, see AST News. SPORTWAVE technical guides remain the primary reference for project-selection logic.

Have a specific project rather than a general question?

Use the guides to understand the main decisions, then send SPORTWAVE the project location, approximate dimensions, intended use, operating period and known site constraints.

Request an ice-rink proposal or contact SPORTWAVE with a technical question.